Project Overview
Fit up of existing fast food establishment into drive through Starbucks. Interior renovation including paint at walls, soffits, and BOH areas and Jute Material Graphic at the seating area and vinyl graphic at restroom area. Exterior renovation included applying transparent penetrating oil to exposed wood, and painting stucco and faux rock throughout exterior. Completed the project on schedule and on budget in May 2019.
Project Details
Painting:
- Exterior Stucco & Faux Rock- 5,000 sq.ft.
- Exterior Metal Including Trash Enclosure & Storefront
- Exterior Wood- Spray & Back rolled transparent penetrating oil
- Interior Drywall- 2,000 sq.ft.
Wallcovering:
- Vinyl Graphic at Restroom area
- Natural Fiber Jute Material with printed graphic at seating area
General Contractor:
Harvey General Contracting
Owner:
Starbucks Coffee Company